Project Highlight At a prominent confectionery site in York, Newsome has implemented a high-capacity 400 kW chiller, marking the noteworthy realisation of the project. Designed to strengthen ESG targets, the installation improves cooling reliability while lowering overall energy usage and CO₂ emissions. https://thebookpage.com/story6165126/high-efficiency-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving