If a type of criteria is discovered to get a major deficiency, the contractor’s entire system is considered being unacceptable. In such a case, not merely will have to the contractor receive consent to subcontract, in accordance with DFARS 252.242-7005, which is required to become included in CAS coated contracts https://contractorpurchasingsyste75207.wizzardsblog.com/33680285/about-cpsr